The following list identifies areas on campus that have undergone upgrades of telecommunications cabling and replacement or installation of additional wireless access points (WAPs).
This is a multi-year project. Learn about progress made in other years:
Fiscal Year 2013/14
Fiscal Year 2014/15
Fiscal Year 2015/16
Fiscal Year 2017/18
Fiscal Year 2018/19
Fiscal Year 2019/20
Pending Waitlist
This list is in the order work is planned and will continue to be updated as scheduling may change and as work is completed.
*Areas with an asterisk received new WAPs (hardware) where WAPs may have already existed.
(Tip: To find a specific building, in most browsers you can use the “find” feature by simultaneously pressing Ctrl+F and typing in the building name. You can click the table column headings to sort in alphabetical or numerical order.)
Building |
Area |
Status |
CPAC |
S-123, S-124, and S-125 |
Completed Fall 2016 |
Engineering Technology |
all workshop area |
Completed 11/2016 |
Engineering 3 |
all, except auxiliary Boeing Building |
Completed 10/2016 |
Engineering 4 |
all |
Completed 11/2016 |
Kinesiology |
rooms 51A/51B/58/59 |
Completed 12/2016 |
Facilities Corporate Yard - Design & Construction Services |
Entire suite |
Completed 01/2016 |
Facilities Management |
Eastern portion of building |
Completed 01/2017 |
Academic Services |
1st floor room 133 |
Completed 12/2016 |
MLSC* |
all |
Completed 11/2016 |
Microbiology* |
all |
Completed 11/2016 |
Academic Services* |
2nd Floor |
Completed 12/2016 |
Engineering Technology |
room 239 |
Pending (near future) |
Engineering Technology |
1st floor |
Pending (near future) |
Engineering Technology |
2nd floor |
Pending (near future) |
Library |
2nd and 3rd floors |
Pending (near future) |
Library |
1st and Lower Level |
Pending (near future) |
Studio Theater |
1st floor |
Pending (near future) |
Studio Theater |
2nd floor |
Pending (near future) |
Fine Arts 2 |
1st floor |
Pending (near future) |
Fine Arts 2 |
2nd floor |
Pending (near future) |
Peterson Hall 1 |
ALL areas |
Pending (near future) |
Engineering / Computer Science |
3rd and 4th floor |
3rd floor completed 10/2017 |
Engineering / Computer Science |
5th and 6th floor |
Pending (near future) |
Fine Arts 3 |
1st floor |
Pending (near future) |
Fine Arts 3 |
2nd floor |
Pending (near future) |
Fine Arts 4 |
1st floor |
Pending (near future) |
Fine Arts 4 |
2nd floor |
Pending (near future) |
Faculty Office 4 |
1st floor |
Pending (near future) |
Faculty Office 4 |
2nd floor |
Pending (near future) |
Liberal Arts 1 |
1st floor |
Pending (near future) |
University Police |
|
Pending (near future) |