Pending Waitlist
The following list identifies areas on campus that are waiting for upgrades of telecommunications cabling and replacement or installation of additional wireless access points (WAPs). This is a multi-year project, so progress is based on future funding.
This list will continue to be updated as scheduling may change and as work is completed.
*Areas with an asterisk received new WAPs (hardware) where WAPs may have already existed.
(Tip: to find a specific building, in most browsers you can use the “find” feature by simultaneously pressing Ctrl+F and typing in the building name. You can click the table column headings to sort in alphabetical or numerical order.)
Building |
Area |
Status |
Engineering / Computer Science |
5th and 6th floor |
Pending (near future) |
Engineering Technology |
room 239 |
Pending (near future) |
Engineering Technology |
1st floor |
Pending (near future) |
Engineering Technology |
2nd floor |
Pending (near future) |
Fine Arts 2 |
1st floor |
Pending (near future) |
Fine Arts 2 |
2nd floor |
Pending (near future) |
Fine Arts 3 |
1st floor |
Pending (near future) |
Fine Arts 3 |
2nd floor |
Pending (near future) |
Fine Arts 4 |
1st floor |
Pending (near future) |
Fine Arts 4 |
2nd floor |
Pending (near future) |
Liberal Arts 1 |
1st floor |
Pending (near future) |
Studio Theater |
1st floor |
Pending (near future) |
Studio Theater |
2nd floor |
Pending (near future) |
University Police |
|
Pending (near future) |
Learn about progress made in other years:
Fiscal Year 2013/14
Fiscal Year 2014/15
Fiscal Year 2015/16
Fiscal Year 2016/17
Fiscal Year 2017/18
Fiscal Year 2018/19